
Add to Cart
Machine Specification:
No. | Name | Detail |
1 | Change mold time | 5--10mins |
2 | Capacity | 2.5-30000 pcs/h |
3 | Capsule Size | 000#,00L,00#,,0L#,0#,1#,2#,3#,4#,5#, |
4 | Material | Pellet and powder |
5 | Total Power | 4.0kw |
6 | Air Compressor | 0.03m3/min 0.7Mpa |
7 | Vacuum Pump | 40m3/h |
8 | Machine Dimension | 1140×700×1630mm |
9 | Packing Dimension | 1172×870×1750mm |
11 | Net Weight | 380kg |
12 | Gross Weight | 500kg |
13 | Voltage | 380V/50Hz/3 Phase |
Description:
CGN208-D type capsule filling machine is a new efficient equipment based on DTJ-C model (old type) after research and development: easier more intuitive and higher loading in capsule dropping, U-turning, vacuum separation in comparison with the old type. The new type of capsule orientating adopts columns pill positioning design, which shortens the time in the replacement of mould from the original 30 minutes to 5-8 minutes. This machine is one type of electricity and pneumatic combined control, automatic counting electronics, programmable controller and frequency conversion speed regulating device. Instead of manual filling, it reduces labor intensity, which is the ideal equipment for capsule filling for small and medium-sized pharmaceutical companies, pharmaceutical research and development institutions and hospital preparation room.
Electrical Part List:
No. | Name | Model | Brand | Quna. | Note | |
1 | M1 | Vacuum pump | XDB-040 | China | 1 | |
2 | M3-4 | Motor | Y263M2-4 | China | 2 | |
3 | M5 | Reducer | GV-22400W-7.5:1 | China | 1 | |
4 | VFD1-3 | Inverter | DVM-2S004G-02 | China | 3 | |
5 | Reducer | NMRV40-63B5-15:1 | China | 1 | ||
6 | Reducer | WPWD-50-40:1 | China | 1 | ||
7 | TC | Inverter | JBK3-63 | China | 1 | |
8 | KA1-2 | Relay | JIX-2C | Omron | 2 | |
9 | KM1-2 | Relay | CJX2-12 | Schneider | 2 | |
10 | QS1 | circuit breaker | DZ47-63 D20 | Schneider | 1 | |
11 | QS2 | circuit breaker | DZ47-63 C6 | Schneider | 1 | |
12 | SA1 | Emergency Switch | Y090-11X | China | 1 | |
13 | Control Panel | PC | China | 1 | ||
14 | Filling Cylinder | SC50X125 | China | 1 | ||
15 | Lock Cylinder | MAL100X80 | China | 1 | ||
16 | Air Regulating Valve | AFR-2000 | China | 2 | ||
17 | FK2 | Photoelectric switch | GL-8F | Japan | 1 | |
18 | FK1 | Approach Switch | H12-D5NK | China | 1 | |
19 | SB2 | Filling Button | AD16 | China | 1 | |
20 | SB1 | Jog/Automatic button | BZ101C | Schneider | ||
21 | SB3-6 | Button | BWB31C | Schneider | ||
22 | YV1 | Electromagnetic valve | 4V210-08 | China | ||
23 | Pedal valve | G522R | China |
|
Technical Service, Installation Commissioning, Packing &Transportation
Within 15 days after the contract takes effect, seller will provide buyer equipment layout designed according to buyer’s workshop drawing.
The technical documentation shipped with equipment are as folow:
After all equipment arrive at user’s factory, the packing should be opened to check goods amount, seller
Technician will guide the installation, commissioning and trial run. During installation and commissioning, seller is responsible for providing relevant spare parts. Buyer is responsible for engineer air ticket, local food and hotel.
Seller takes charge of providing technical training to buyer. Training contents equipment structure,
Maintenance, control and operation, Buyer’s technician can master relevant operation and maintenance skills, adjust techniques skillfully and hands faults in time
The warranty time is 12 months since acceptance of the equipment or 15months since deliver to loading port
After warranty, seller can provide comprehensive and favorable technology support.
Seller should use new and firm special packing cases according with china quarantine standard, which are suitable for long distance transportation, antirust and damp proof.